Congratulations to Carroll Concrete on winning an Architectural “Excellence in Concrete” award for their work on the Jay Peak Pump House project. The award was given by the Northern New England Concrete Promotion Association. DEW, Harrison Concrete, Black River Design and Aquatic Development Group were recognized as well.
Current Projects
DEW Wins Best Builder Award
Congratulations to the Waterbury Fire Stations team! The project was selected by the Associated General Contractors of Vermont to receive a 2011 Best Builders Award for Outstanding Quality of Work and Effort in the Building, New Construction category. Don Wells, President, Jeff Davis, Executive Vice President, Tim Heinlein, Project Manager and Larry Bertrand, Superintendent, received the award at AGC’s annual meeting in Burlington. DEW Construction Corp. was hired in 2010 to provide Design/Build services to the Town of Waterbury to build two new energy-efficient fire stations to replace existing fire stations in the Town and Village of Waterbury, Vermont. The Main Street Station site was selected because it was desirable to have the fire station remain in the Village setting. The site, however, is located in a FEMA flood plain. DEW and Architect Wiemann Lamphere, designed and built a structure that could stand up to the 100 year flood level – and two months after we turned it over, and two weeks after the formal ribbon cutting, it was tested by Tropical Storm Irene. The flooding in Waterbury crested just above the 100 year flood level. Remarkably the station fared well – it suffered only a relatively small amount of water damage. The good news – no materials had to be removed or replaced. All in all, a success for flood design and construction.
Recently Awarded
DEW has recently been awarded the following projects: Freedom Nissan Renovation – So. Burlington, VT $500 Thousand Enosburg Health Center – Enosburg Falls, VT $970 Thousand 802 Toyota Dealership – Berlin, VT $3.4 Million Champlain Orthodontics Rebuild – Burlington, VT $ 5 Million
Jay Peak Water Park on Front Cover of Boston Globe
Jay Peak was spotted again – this time on the front cover of the Boston Globe. They talk about the Green Card program. Check it out when you get a chance. http://www.boston.com/news/local/vermont/articles/2011/10/25/jobs_for_green_cards_a_controversial_program_expands/?page=1
DEW Breaks Ground on Wound-Care Center
Saranac Lake, NY – A Groundbreaking Ceremony was held on September 22, 2011 for Airondack Medical Center’s new $2.7 million wound-care center. The 9,000 square foot facility will specialize in the treatment of patients who have chronic wounds, such as the elderly, people with diabetes and vascular disease and cancer patients who’ve undergone radiation treatment. The center will have a pair of hyperbaric chambers, which provide pressurized oxygen therapy that is designed to heal wounds quicker. The new 2-story building will house the wound-care center in the first floor of the building while the second floor will have physician offices that the hospital plans to lease. “It is great to be working with Adirondack Medical Center again and on this important project for the Adirondack community”, said Don Wells, President of DEW. “Construction is well underway and we expect the building to be complete sometime in mid to late February. “